Sinda SIND

Sinda reports third quarter 2026 results

Item 2.02 Reports results

Form
8-K
Filed
Importance
Major
  1. Launched earthworks in September, moving 6,500 cubic meters of material.
  2. Completed 31,150 meters of drilling in Q3 2026, including a high-grade intercept of 12,494 g/t AgEq.
  3. Added to VanEck Junior Gold Miners ETF on September 18, 2026.
  4. Appointed Alberto Zinser to the Board of Directors on October 12, 2026.

Written from the 8-K on EDGAR. Check the filing before you rely on it.

Get an email when Sinda files

Only major filings: results, leadership changes, listing notices and other major events, each with the plain-English summary when we have one or the key facts and the EDGAR link. Routine insider filings never email. Confirm once; unsubscribe in one click.

The reading, claim by claim

  1. The filing includes a press release announcing these results, which is incorporated by reference.
  2. The press release highlights operational progress, including earthworks and drilling activities.
  3. It mentions the completion of 31,150 meters of drilling during the quarter.
  4. The filing also includes an interactive data file for the financial statements.

4 of 6 claims matched the filing text.

Not found in the filing text

  • The company also notes the preparation of the exploration decline portal and the Waste Rock Storage Facility.
  • Sinda Ltd. reported a net loss of $14.9 million for the quarter ended September 30, 2026.

From the filing

Item 2.02.

Item 2.02.

Results of Operations and Financial Condition.

On November 2, 2026, Sinda Ltd. (the "Company") issued a press release announcing its financial results for the quarter ended September 30, 2026. A copy of the press release is furnished as Exhibit 99.1 to this Current Report on Form 8-K and is incorporated herein by reference.1

The information provided in this Item 2.02 of Form 8-K, including Exhibit 99.1 hereto, shall not be deemed "filed" for purposes of Section 18 of the Securities Exchange Act of 1934, as amended (the "Exchange Act"), or otherwise subject to the liabilities of that section, nor shall it be deemed incorporated by reference into any of the Company's filings under the Securities Act of 1933, as amended, or the Exchange Act, except as expressly set forth by specific reference in such filing.

Item 9.01.

Item 9.01.

Financial Statements and Exhibits .

(d)

Exhibits

Exhibit Number

Description

99.1

Press Release, dated November 2, 2026.

1044

Cover Page Interactive Data File (embedded within the Inline XBRL document).4

Signatures

Pursuant to the requirements of the Securities Exchange Act of 1934, the registrant has duly caused this report to be signed on its behalf by the undersigned hereunto duly authorized.

SINDA LTD.

By:

/s/ Scott Cole

Name:

Scott Cole

Title:

Interim Chief Financial Officer

Date: November 2, 2026

NYSE: SIND | BMV: SIND

Sinda Ltd. Reports Third Quarter 2026 Results, Highlighting Continued Drilling Success and Notable Progress Toward the Caracol Exploration Decline

SAN MIGUEL DE ALLENDE, Mexico – November 2, 2026 – Sinda Ltd. (NYSE: SIND) ("Sinda" or the "Company") today announced third quarter 2026 results and the filing of its Form 10-Q.

"Sinda is laying the foundations for a world-class silver-gold mine, with the third quarter bringing excellent progress in drilling, exploration and site preparation" said Daniel Muñiz, Sinda's Executive Chairman. "Our priorities are clear: methodically and consistently take the project up the value chain, invest our capital where it can generate the highest returns, and meet or indeed exceed our key milestones. With a generational discovery, an experienced leadership team, and a disciplined approach to execution of our development plan in a superb location, we are well positioned to deliver exceptional long-term returns for Sinda's shareholders."

Third Quarter 2026 Highlights

Operational Highlights2

•2

Launched earthworks in September, an important milestone in preparing for underground development.2 2Work included preparing the exploration decline portal and the Waste Rock Storage2

Facility (WRSF), with approximately 6,500 cubic meters of material moved during the quarter.2

•2

Advanced Phase 2 drilling2, deploying 18 rigs and completing approximately 31,150 meters in3

Similar companies

Companies of similar size in SIC 1040 and related industry codes: the same peer list as the financial tables.